Colemans Hill Farm two days before demolition starts |
It was barely light when the demolition team arrived on site
complete with a pristine new Merlo telehandler.
An hour or so later Chris Smith (“batman”)was taken up in the Merlo cage
to check whether the bat he had seen enter the roof back in May was still there
(it wasn’t) and to advise on the course of action should any be found during
removal of the tiles.
|
Batman checks capping tiles for bats |
|
First stage: removing roof tiles from Eastern elevation |
Nigel and I continued to carefully remove topsoil from the
build area and transfer it to the lower garden area for redistribution later.
|
Levelling site for new foundations |
By the end of the day most of the tiles had been removed and
were heading for Winchcombe Reclamation and we had almost levelled the foundation
area ready for pegging out the floor slab. Negotiations continue with three possible contractors to install the highly
insulated passive slab.